First People's Plus' Facility
First People's Plus is setting new standards in the co-location market. In order to ensure the highest
uptime and around-the-clock availability required by today's most business critical,
high-volume Internet operations. Our co-location facility incorporates the latest technologies
to ensure top quality service.
First People's Plus addressed all possible eventualities in the design process of our new facility.
Our co-location facility includes:
Power System
Dedicated high voltage feed from our own dedicated local substation
3 Phase UPS back-up (30+ minutes of full power)
Redundant diesel power generators, set to engage automatically following a power interruption
Internal power distribution units that monitors and delivers clean, dedicated power to customer circuits
The First People's Plus power distribution network provides continuous, computer-grade power 24 hours a day,
every day of the year. Simply put, the First People's Plus facility is built to be up and running around the clock.
Climate Control
Minimum N+1 redundancy
Temperature and humidity controls set to observe strict tolerances
Designed to keep your equipment operating at peak efficiency by providing an environment that
is optimal for server performance. First People's Plus' data centre is equipped with advanced climate
control systems. Temperature and humidity are constantly monitored and controlled to exacting standards.
Fire Control
State of the art fire detection system as per NFPA and local codes
Advanced fire suppression system using FM200 Gas
Security
Fail-over firewalls
Limited authorized access to facility
24 hour digital monitoring
|